MV Cape Don Society
Gif Button by Vista-Buttons.com v4.5.0

Weekend Work – Photos 2010

March | April | May | June | July

Hold mouse over each image to see description. Click on images to show larger view.

July
Weekend 24th/25th
Daniel working on Boat Deck
John working on Well Deck railing
Pete checking donated MIG welder
Rotten decking removed from Boat Deck
Tim cleaning off rust before painting hull
Warwick cleaning off rusted metal on the side plates
Warwick working on repaired railing gate
     
Weekend 10th/11th
Night work
Checking the gate
Working on the starboard bridge wing
   
June
Weekend 26th/27th
Moving the battery box
Battery box moved!
Descaling the deck after battery box move
Cala and John sealing the deck
Crane control unit ready to be lowered to the ship after repairs
Hugh, Pete and Daniel on bridge wing
       
Weekend 12th/13th
Washing the bulkhead
Welding on the bridge deck
Stairs installed
 
Back to top
Covered crane
Pete working on davit base
Space for stairs
Warwick working on catwalk
 

May
Brian, chipping
Painting well underway on Boat Deck
Warwick replacing new air feed pipes
   

April
Carla and Edna
Brian, checking out the scuppers
John on higher duties
Edna, 'gardening'
John applying undercoat

March
Visitors from MV Pacific Link
Peter and Warwick lowering more goods
Carla hard at work
Peter working on davit baseplate
Back to top


Previous Years

2009
2008


We need your help!

Volunteer today!